Single-Phase or Three-Phase Generator: 220 or 380 V

ADD Group engineers ·

Single-Phase or Three-Phase Generator: 220 or 380 V

We will help you ensure reliable backup of your facility with ADD Group diesel generators

You may also like

Petrol Generator in Frost: Starting and Storage
3 days ago

Petrol Generator in Frost: Starting and Storage

What to look for when choosing a generator: power, fuel and operating conditions.

Read
kW and kVA in Generators: The Difference and How to Convert
1 week ago

kW and kVA in Generators: The Difference and How to Convert

What to look for when choosing a generator: power, fuel and operating conditions.

Read
Generator for a Gas Boiler: Which One to Choose
1 week ago

Generator for a Gas Boiler: Which One to Choose

What to look for when choosing a generator: power, fuel and operating conditions.

Read
Operating a Diesel Generator in Winter: How to Prepare for Frost
2 weeks ago

Operating a Diesel Generator in Winter: How to Prepare for Frost

What to look for when choosing a generator: power, fuel and operating conditions.

Read
Inverter or Conventional Petrol Generator: Which to Choose
2 weeks ago

Inverter or Conventional Petrol Generator: Which to Choose

What to look for when choosing a generator: power, fuel and operating conditions.

Read
How to Choose a Pressure Washer for Home and Car Washing
3 weeks ago

How to Choose a Pressure Washer for Home and Car Washing

What to look for when choosing a generator: power, fuel and operating conditions.

Read
How to Choose an Air Compressor: Flow Rate, Pressure, Receiver
1 month ago

How to Choose an Air Compressor: Flow Rate, Pressure, Receiver

What to look for when choosing a generator: power, fuel and operating conditions.

Read
How to Calculate Starting Current When Selecting a Generator?
4 months ago

How to Calculate Starting Current When Selecting a Generator?

When selecting a generator, it is not enough to add up the running power of all appliances and include a small safety ma...

Read

Characteristics

Price

* Price includes VAT

More

Cost configurator

Standard configuration by default

Product

ADD-Power mini ADD13800GET

1 120 000₸

ATS output
Battery
1 liter of oil
Control panel
Adapters

Add to configuration

Product

ATS

1 120 000₸

An automatic transfer switch (ATS) keeps the power on by automatically switching the load to a backup source when the main supply fails.

Delivery

Your order

By default

ADD-Power mini ADD13800GET 1 120 000₸

You added

ABP 120 000₸
Extended warranty 40 000₸
Mounting 25 000₸
Connection 30 000₸
Delivery 20 000₸
Added total: 170 000₸
Total to pay: 1 270 000₸

Including VAT